上海里浦电器照明有限公司

普通会员展厅
上海里浦电器是一家专业生产镇流器,变压器,触发器,电容,电器箱,的生产厂家,公司位于上海市宝山经济开发区。自1992年成立以来,上海里浦电器照明有限公司已经成为该行业的主要生产厂商之一,公司占地面积10000多平方米,月生产能力500000个以上,为保证产品的高品质以及能够更好的适合国际市场,公司投资更新了生产设备,同时,公司还有一套严格的质量控制体系以保证客户能够得到满意的产品。“最好的质量,最好的价格,最好的服务”是公司经营理念,在经过十几年的发展过程中,我们的产品在国内外都取得了较好的声誉。目前,公司大部分产品出口世界各地,如:欧洲,亚洲,中东,南美,非洲等等。我们的诚信经营和始终坚持不懈对产品质量和服务的改进使我们得到了丰厚的回报。目前,公司产品已经通过了CCC,TUV,EMC,EEI=B2,CE,ROHS,SASO等国内外认证。我们真诚我希望能同广客户长期合作,共创美好的未来。
8
粉丝数
71
总内容量
24006
总阅读量
0
关注
联系人:林芝
手机:13764526887
模式:生产厂家/经销商
地区: 上海 上海市

推荐产品

Recommend

PRIS001-P01K 红外感应器

FUNCTION :Can identify day and night: The consumer can adjust work ambient light. It can work in thedaytime and at night when it is adjusted on the “sun” position (max). It can work in theambient light less than 3LUX when it is adjusted on the “moon” position (min). As for the adjustment pattern, please refer to the testing pattern.SENS adjustable: It can be adjusted according to using location; low sensitivity with 5m for detection distance; high sensitivity with 10m, it fits for large room.Time-delay is added continually: When it receives the second induction signals after the first induction, it will compute time once more on the rest of the first time-delay basic (set time).Time-delay adjustment: It can be set according to the consumer’s desire. The minimum time is 10sec±3sec. The maximum is 7min±2min.MANUAL OVERRIDE FUNCTION:The light can stay ON for longer time periods by using the manual override function.Under PIR Mode,simply turn off/on/off/on the power within 3 seconds, then the unit will be in Override Mode and the light will stay ON.To switch back to PIR Mode, turn off the power, and 10 seconds later, turn it back on.SPECIFICATION:Model No.PRIS001-P01KPower Source:220 -240V/ACDetection Range:120°Power Frequency:50HzWorking Temperature:-20~+40℃Ambient Light:3-2000LUX (adjustable)Working Humidity:93%RHTime-Delay:min: 10sec±3sec max: 7min±2minInstallation Height:1.8m~2.5mDetection Motion Speed:0.6~1.5m/sRated Load:100W (led lamp)Detection Distance:10m (24℃)\INSTALLATIION: (see the diagram)Switch off the power.Connecting the power and the load to sensor as per the connection-wire sketch diagram.Switch on the power and test it. CONNECTION

最新产品

NEW

最新文章

RECENT ARTICLES

    没有相关文章

查看更多